Mistakes stopped at the station
Wrong steel cut. A piece moved past QC. A weld approved by its own welder. A bad piece loaded. Each one turns into rework, a field fix or a back charge. Construction studies put rework at 2–20% of project cost, most often around 5%. We start at 3%, and assume ForgeEPM prevents only a fifth of it.